ESG - Renewable Energy

Green Financing Project - Renewable Energy

Green Products and Services

Top 3 Renewable Energy Projects

POSO HYDRO POWER PLANT

This project is a combination of the Poso Hydroelectric Power Plant which exists (3x65 MW) which has been operating since 2012 as well as the Poso Hydroelectric Power Plant Extension stage 1 (4x30 MW) and Poso Extension PLTA stage 2 (4x50 MW). Third The plant is planned to be operated as a power plant Peak with a total capacity of 515 MW. This Peaker Generator will operated on peak load time is 17.00 to 22.00 with Exclusive Committed Energy of 1,669 GWh per year. The Poso hydroelectric power plant handles approx 10.69% from South Sulawesi's total electricity EBT system. Generator electricity This environmentally friendly system has been interconnected with transmission lines 275 rectangle to South Sulawesi Province and 150 kV transmission from the generator to City Palu, Central Sulawesi.

KERINCI HYDRO POWER PLANT

LTA Merangin utilizes river flow Moaning Which comes from the flow of Lake Kerinci which is planned to be operated as Peaker Plant with a total capacity of 350 MW. Peaker Generator This will operated at peak load times, namely 18.00 to 23.00 with Exclusive Committed Energy of 1,280 GWh per year.

LAHAT MINI HYDRO POWER PLANT

PLTM Lahat 9.9 MW is in commercial operation on 28 November 2015 and the PPA period will last until 27 November 2035. Based on data obtained from feasibility studies during development PLTM, the power plant uses Endikat River water with The watershed discharge covers an area of 284.32 km2 with a river length of 41 km and average bulk annual rainfall 222.17 mm. The average water discharge is 13,217 m3/s with head net of 89.21 m. Based on these calculations, it is obtained capacity installed is 10 MW.